Island Bath Studio
Bathroom renovation in Hicksville

Hicksville, Nassau County

Bathroom Renovation in Hicksville, NY

Local bathroom remodels, walk-in showers, and full gut renovations for Hicksville homeowners. Schluter-Certified waterproofing. Nassau permits pulled in-house. 4.9★ from 163+ Long Island reviews.

Nassau County HIC #H2419300 NKBA Certified 4.9

Get Your Free Bathroom Estimate

On-site quote, firm number, no high-pressure sales. Response within 1 business day.

No spam. No high pressure. We call once, answer your questions, schedule the on-site if you want.

Licensed & Insured

Nassau County & Suffolk

NKBA Certified

Certified Bath Designer

4.9 / 5.0

163+ reviews

640+ Bathrooms

Since 2012

Serving Hicksville

Bathroom renovations built for the way Hicksville homes are actually built.

Hicksville was largely built out in the 1950s–1970s — split levels, ranches, colonials with the original hall bath and master still in place on many blocks. We know the framing, the plumbing era, and what surprises to expect behind the tile (cast iron drains, galvanized supply, occasional framing rot at the tub wall plate).

On a typical Hicksville bathroom remodel we pull a Nassau County permit, strip the bathroom to studs, replace the drain stack with PVC and supply with PEX, waterproof with Schluter Kerdi or Kerdi-Board, and rebuild with modern tile, vanity, and fixtures. Most Hicksville hall baths finish in 3–4 weeks.

We've completed dozens of Hicksville bathrooms over the past decade. Common requests: tub-to-shower conversions for aging homeowners, master bath expansions into closet space, full kid-bath refreshes with slip-resistant tile.

Hicksville bathroom remodel

Service zip codes

11801 · 11802 · 11815

Approximately 20–40 minutes from our Mineola studio.

What we've learned in Hicksville

Local details that matter.

The 1960s colonial tub problem

Original Hicksville colonials have a cast iron tub on a wood-framed second floor. Those tubs weigh 350+ pounds empty. If you're converting to a shower, we often find framing that was never quite right — we inspect, sister joists if needed, and move on with the rebuild.

Nassau permits are routine

Nassau County's bathroom permit process is straightforward once you know the inspector's preferences. We file digitally, schedule rough and final inspections in-sequence, and you never need to call the county.

School-zone traffic windows

Hicksville school buses run heavy on Old Country and Jerusalem Ave. We schedule demo-day trucks outside school start/end windows so neighbors stay happy and we stay productive.

Cast iron drain replacement

Original Hicksville plumbing is cast iron drain stacks — they last 50+ years but when they fail, they fail hard. During a full remodel we always replace the in-wall drain section with PVC. One extra day of labor, lifetime reliability.

Live Job Log

Recent Bathroom Jobs in or near Hicksville

Real Nassau County bathroom projects completed in the last few months.

Master Bathroom Renovation

Master Bathroom Renovation

Completed full master bathroom remodel: curbless walk-in shower, Schluter Kerdi waterproofing, 12x24 porcelain floor, freestanding tub, double vanity with quartz.

Garden City Apr 2026
Tub to Shower Conversion

Tub to Shower Conversion

Tub-to-shower conversion in Hicksville colonial: pulled cast iron tub, rebuilt framing, Kerdi-Line drain, large format porcelain tile, frameless glass.

Hicksville Mar 2026
Full Bathroom Remodel

Full Bathroom Remodel

Full gut remodel in 1960s Huntington cape: new plumbing rough-in, Schluter Ditra underlayment, herringbone marble floor, shaker vanity.

Huntington Mar 2026
Accessible Bathroom Remodel

Accessible Bathroom Remodel

ADA / aging-in-place remodel in Smithtown: curbless shower, grab bars, comfort height toilet, slip-resistant porcelain, wider 36" doorway.

Smithtown Mar 2026
Walk-In Shower Installation

Walk-In Shower Installation

Walk-in shower install in Massapequa hall bath: Kerdi-Board walls, linear drain, Calacatta subway tile, bench seat, thermostatic valve.

Massapequa Mar 2026
Shower Renovation

Shower Renovation

Shower renovation in Commack: new Schluter pan, rebuilt shower curb, mosaic floor, subway walls, brushed nickel trim kit.

Commack Feb 2026
Master Bathroom Renovation

Master Bathroom Renovation

Master bath remodel in Great Neck: relocated plumbing for freestanding tub, double vanity, floor-to-ceiling tile, Nassau permit pulled.

Great Neck Feb 2026
Bathroom Tile Installation

Bathroom Tile Installation

Full bathroom tile installation in Levittown: 24x48 large format walls, herringbone floor, schluter profile edge trim.

Levittown Feb 2026

Hicksville homeowners

What Hicksville homeowners say.

Angela's team gutted our 1970s hall bath and turned it into a spa. Zero-threshold shower, Schluter waterproofing, linear drain, perfect tile lines.

Jennifer M.

Hicksville, NY · Full Remodel

Tub to shower conversion in our 1960s Hicksville colonial. Pulled cast iron tub, rebuilt framing, Kerdi-Line drain, large format porcelain.

Chris N.

Hicksville, NY · Tub to Shower

Tile install Hicksville: wood-look porcelain floor, 12x24 walls, Schluter-Jolly edge profiles, herringbone shower niche accent.

Marco T.

Hicksville, NY · Tile Install

Questions from Hicksville

Most-asked about bathroom remodels in Hicksville.

Bathroom renovations in Hicksville typically run $18,000–$45,000 for a standard hall bath and $30,000–$80,000+ for a master bath, depending on scope. We walk your bathroom on-site and give a firm, itemized number within 48 hours.

Nassau County requires a permit for any bathroom project involving plumbing relocation, electrical work, or structural changes. Cosmetic refreshes (tile, vanity, fixtures only) usually don't. We pull the permit for you.

Our typical backlog is 6–10 weeks. If you have a hard deadline (move-in, relative arriving, resale), tell us — we do our best to sequence accordingly.

Yes — Island Bath Studio serves all of Nassau County from our Mineola studio. Hicksville is well within our service area and we've completed projects there routinely.

Standard hall bath: 3–4 weeks. Master bath: 4–6 weeks. Tub-to-shower conversion only: 2–3 weeks. Shower-only rebuild: 2–3 weeks including glass.

Ready when you are

Let's start your bathroom.

Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.

640+

Bathrooms Completed

4.9

163 Google Reviews

1 day

Callback Window

Licensed & Insured NKBA Certified On-Time Finish

Get Your Free Bathroom Estimate

On-site quote, firm number, no high-pressure sales. Response within 1 business day.

No spam. No high pressure. We call once, answer your questions, schedule the on-site if you want.