
Master Bathroom Renovation
Completed full master bathroom remodel: curbless walk-in shower, Schluter Kerdi waterproofing, 12x24 porcelain floor, freestanding tub, double vanity with quartz.

Tile laid right
Large format. Herringbone. Mosaic. Schluter-Certified waterproofing underneath. Edges finished with Schluter-Jolly or Schluter-Reno profiles.
On-site quote, firm number, no high-pressure sales. Response within 1 business day.
Licensed & Insured
Nassau County & Suffolk
NKBA Certified
Certified Bath Designer
4.9 / 5.0
163+ reviews
640+ Bathrooms
Since 2012
Our tile specialists
Tile is the most visible part of a bathroom and the part most commonly installed poorly. Crooked grout lines, lippage you can feel with a bare foot, cracked cuts at the niche, visible cut edges because nobody used edge profiles. We've fixed hundreds of these.
Our tile specialists dry-fit every shower and major floor before any thinset comes out. They mix lot numbers to avoid color banding. They set tile with a 1/3 offset on large format (not 50%, which creates lippage). They use Schluter-Jolly or Schluter-Reno profiles instead of bullnose so cut edges stay crisp and cool.
We run lippage-control systems on large format. We seal grout after cure. We back-butter every tile on full-height walls. These are basic-professional practices that separate a real tile install from a general-contractor 'tile day'.

What's included
Our Process
No mystery. No surprise delays. Here's the exact sequence.
We help you pick: large format, mosaic, herringbone, subway, natural stone. Lot availability, lead times, order padding for cuts.
Schluter Ditra on floors, Kerdi on wet walls. No tile over drywall, no tile over unstable substrate.
24–48 hour dry-fit of all walls and floors. Cuts dialed in, niches centered on tile grid, not butchered.
Tile set in small batches with lot-mixing. Grout after 24 hours. Seal after 72 hours. Silicone at change-of-plane joints.
Materials We Trust
We only install systems we can stand behind for twenty years. No brand bait-and-switch mid-job.

Daltile, Marazzi, Florida Tile, MSI
Porcelain mainstays with consistent lot production. Large format (12x24, 24x24, 24x48) is our usual first recommendation.
Natural stone: marble, limestone, travertine
Calacatta, Carrara, Statuario. We seal twice before grouting and educate homeowners on long-term care. Stone is beautiful, and it demands attention.
Schluter-Jolly + Schluter-Reno-U profiles
Aluminum or anodized edge profiles at tile terminations. Square, crisp, finished — not bullnose.
Lippage control systems
Leveling clips and wedges on large format to keep tile plane dead flat. No 'I can feel the edge with my foot' installs.
Mapei or Laticrete thinset + grout
Unmodified for Kerdi, modified for standard tile. We use the right product for the substrate — critical for warranty.
Worth knowing first
24x48 porcelain on a wavy floor is a lippage nightmare. We flatten substrates before tile — sometimes with self-leveler, sometimes with shims under Ditra. This is a full extra day on some jobs and it's worth it.
Herringbone layouts waste tile at every cut. We quote 20% material overage (not 10%). Having enough tile to finish without a lot-change is non-negotiable.
Grout stains porous stone. We pre-seal before grouting, then grout, then final-seal. Skipping the pre-seal guarantees a haze you can't scrub off.
A niche should center inside tile modules, not cut at random heights. This is design work, not field-improv. We lay it out in advance.
Live Job Log
Real tile installation projects finished in Nassau & Suffolk over the last few months.

Master Bathroom Renovation
Completed full master bathroom remodel: curbless walk-in shower, Schluter Kerdi waterproofing, 12x24 porcelain floor, freestanding tub, double vanity with quartz.

Tub to Shower Conversion
Tub-to-shower conversion in Hicksville colonial: pulled cast iron tub, rebuilt framing, Kerdi-Line drain, large format porcelain tile, frameless glass.

Full Bathroom Remodel
Full gut remodel in 1960s Huntington cape: new plumbing rough-in, Schluter Ditra underlayment, herringbone marble floor, shaker vanity.

Accessible Bathroom Remodel
ADA / aging-in-place remodel in Smithtown: curbless shower, grab bars, comfort height toilet, slip-resistant porcelain, wider 36" doorway.

Walk-In Shower Installation
Walk-in shower install in Massapequa hall bath: Kerdi-Board walls, linear drain, Calacatta subway tile, bench seat, thermostatic valve.

Shower Renovation
Shower renovation in Commack: new Schluter pan, rebuilt shower curb, mosaic floor, subway walls, brushed nickel trim kit.

Master Bathroom Renovation
Master bath remodel in Great Neck: relocated plumbing for freestanding tub, double vanity, floor-to-ceiling tile, Nassau permit pulled.

Bathroom Tile Installation
Full bathroom tile installation in Levittown: 24x48 large format walls, herringbone floor, schluter profile edge trim.
What homeowners say
Tile work is art with these guys. Calacatta mosaic floor, Carrara subway walls, all perfect lines. Two full days of dry-fit before any thinset hit the board.
Greg O.
Commack, NY · Tile
Full bathroom tile installation in Levittown: 24x48 large format walls, herringbone floor, Schluter profile edge trim.
Carol S.
Levittown, NY · Tile
Tile install Hicksville: wood-look porcelain floor, 12x24 walls, Schluter-Jolly edge profiles, herringbone shower niche accent.
Marco T.
Hicksville, NY · Tile
Questions
Yes, but we won't warranty the tile itself (defects, dye lots, calibration). We'll warranty the install. Most clients let us source through our supplier accounts — better pricing and we own the supply chain.
50% offset on large format creates lippage at the center — the long-format industry standard is 33% offset or less. We follow the TCNA standard.
Yes. We install marble, limestone, travertine, and quartzite. We seal twice, grout carefully, and teach you how to maintain it long term.
A full shower tile + bathroom floor is typically 4–6 days. Add 3 days for grout cure and final polish.
Related services
Ready when you are
Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.
640+
Bathrooms Completed
4.9★
163 Google Reviews
1 day
Callback Window
On-site quote, firm number, no high-pressure sales. Response within 1 business day.