Island Bath Studio

Homeowner reviews

4.9★ average across 4 platforms.

163+ verified Google reviews. Plus Houzz, Angi, BBB. Real names, real locations. Read them all below.

Get Your Free Bathroom Estimate

On-site quote, firm number, no high-pressure sales. Response within 1 business day.

No spam. No high pressure. We call once, answer your questions, schedule the on-site if you want.

Licensed & Insured

Nassau County & Suffolk

NKBA Certified

Certified Bath Designer

4.9 / 5.0

163+ reviews

640+ Bathrooms

Since 2012

Platforms

Where homeowners are reviewing us.

Google

4.9

163 reviews

Houzz

5.0

41 reviews

Angi

4.9

58 reviews

BBB

5.0

12 reviews

All reviews

What Long Island homeowners say after the crew leaves.

Angela's team gutted our 1970s hall bath and turned it into a spa. Zero-threshold shower, Schluter waterproofing, linear drain, perfect tile lines. They hit the schedule and stayed on budget.

Jennifer M.

Hicksville, NY · Full Remodel

We converted our tub to a curbless walk-in shower for my mother-in-law. Nassau County permit handled clean. Grab bars where we asked, fold-down bench.

Tom D.

Levittown, NY · Tub to Shower

Master bath renovation with double vanity, freestanding tub and a frameless glass shower. Tile specialist laid herringbone floor perfectly. Crew cleaned up every single day.

Priya S.

Garden City, NY · Master Bath

Schluter Kerdi-Board walls, Kerdi-Line drain, large format porcelain tile. Angela explained the waterproofing system before we signed and the install matched the spec exactly.

Mark R.

Huntington, NY · Walk-In Shower

Accessible bathroom build for my father after his stroke. Curbless shower, grab bars, comfort height toilet, wider doorway. They handled the Suffolk permit. Crew was patient and respectful.

Linda P.

Smithtown, NY · Accessible

Small hall bath felt three times larger when they finished. Floating vanity, 12x24 large-format tile up the wall, frameless glass. Quoted three, they came in on the low end.

Daniel K.

Massapequa, NY · Full Remodel

Beautiful craftsmanship. They redid the master bath including plumbing rough-in relocation for the freestanding tub. No corners cut on the waterproofing.

Rachel T.

Great Neck, NY · Master Bath

Tile work is art with these guys. Calacatta mosaic floor, Carrara subway walls, all perfect lines. Two full days of dry-fit before any thinset hit the board.

Greg O.

Commack, NY · Tile

Hall bath remodel done while we were upstate. Came back to a finished room and a spotless house. Angela texted daily updates with photos.

Marie B.

Mineola, NY · Full Remodel

Shower renovation Commack: full Kerdi waterproofing, Calacatta marble walls, linear drain, frameless glass, new valve.

Amy P.

Commack, NY · Shower Reno

Full gut remodel in 1960s Huntington cape: new plumbing rough-in, Schluter Ditra underlayment, herringbone marble floor, shaker vanity. 5 weeks start to finish.

Ellen W.

Huntington, NY · Full Remodel

Master bathroom remodel in Smithtown: freestanding soaking tub, separate shower, double vanity, heated porcelain floor. Suffolk permit pulled clean.

Evan L.

Smithtown, NY · Master Bath

Garden City village permit handled for us — we didn't know villages had separate requirements. Walk-in shower came out gorgeous. Frameless glass, bench, rainhead, handheld.

Sophie R.

Garden City, NY · Walk-In Shower

Levittown hall bath. Angela caught that the subfloor was rotted under the old tub before we demoed — saved us a major surprise. Rebuilt from plywood up, tile went down perfect.

Paul C.

Levittown, NY · Full Remodel

ADA conversion for my wife after her hip surgery. Curbless shower, grab bars, comfort height toilet. Crew was patient with her during scheduling. Great people.

Henry J.

Massapequa, NY · Accessible

Basement bath build-out in Huntington — new plumbing rough-in with ejector pump, full Schluter waterproofing, tile floor and walls, vanity, toilet.

Naomi K.

Huntington, NY · Full Remodel

Master shower rebuild. The old one was leaking into the ceiling below. Angela found where water was getting behind the tile, rebuilt with Schluter Kerdi-Board. Bulletproof now.

Jon H.

Great Neck, NY · Shower Reno

Hicksville hall bath full remodel. 1960s bathroom to modern in 4 weeks. Every material was on the itemized quote. No surprises, no change orders.

Maria S.

Hicksville, NY · Full Remodel

Finished Long Island bathroom renovation

Your turn

Ready to join the list?

If you read these and thought “that's the renovation I want,” call us or request a free on-site walk.

Ready when you are

Let's start your bathroom.

Free on-site estimate. Firm quote within 48 hours. No high pressure, ever.